News

Delivery sections Parallelweg

Delivery sections Parallelweg

On Friday 10 November, two sections from our Parallelweg location were delivered to our client. These are the third and fourth sections in a series of twenty-two, which are being built at our locations on Industrieweg and Parallelweg. The sections had a length of respectively 19.5 meters and 23.5 meters, of which the shortest section weighs 42 tonnes and the longest section 48 tonnes.

Read more ›
Delivery section Industrieweg

Delivery section Industrieweg

On Tuesday, November 7, 2017 we delivered a section to our client. This is the second section to be built in a series of twenty-two on the Parallelweg and Industrieweg respectively. The section has been retrieved from our Industrieweg location, which is located directly on the water, just like the Parallelweg. This makes it possible for Zwijnenburg to transport large construction parts in an easy way over the water.

Read more ›
Offshore construction

Offshore construction

On September 25th, we turned a large offshore wind steel construction using a floating bucket and roller. The construction is now ready for machining after which the construction will be assembled with another part that is under construction.

Read more ›