News

Transport bulbsection

Transport bulbsection

Beautifull bulbous bow section from B. Zwijnenburg B.V. Parallelweg location “en route” to the IJsselwerf slipway ! Thanks to kraanbedrijf Nederhoff and Lekstroom Transport B.V. for the good transport arrangement !

Read more ›
Railframe IHC IQIP

Railframe IHC IQIP

On January 5, 2018, the rail frame of IHC IQIP was transported at our Parallelweg 8 location. The frame will be used for driving large piles in the sea. The frame is part of a noise barrier, which aims to reduce the noise nuisance level for the subsea world. The frame was completely built, machined and conserved by Zwijnenburg.

Read more ›
Busy times at Zwijnenburg!

Busy times at Zwijnenburg!

On the 17th of November another section was delivered to the Parallelweg. The section was hoisted in a bright autumn sun and transported to the customer on a pontoon. This is already the fourth section that has been delivered in a time frame of 10 days. With this Zwijnenburg has again demonstrated that it can deliver multiple sections simultaneously, on time and in a short period of time.

Read more ›
Delivery sections Parallelweg

Delivery sections Parallelweg

On Friday 10 November, two sections from our Parallelweg location were delivered to our client. These are the third and fourth sections in a series of twenty-two, which are being built at our locations on Industrieweg and Parallelweg. The sections had a length of respectively 19.5 meters and 23.5 meters, of which the shortest section weighs 42 tonnes and the longest section 48 tonnes.

Read more ›